SheetAbout the shop
Runs1 to 50,000
Quote2 working days
RevA
Who we are

Engineering that starts before the tooling

Most of the cost in a part is decided at the drawing stage, which is why we would rather see it early than quote it late. We run prototype batches of one and production runs into the tens of thousands on the same machines and the same fixtures.

Every batch leaves with its inspection records. If the drawing calls for a material certificate, it travels with the first delivery.

A belt drive and pulleys on a machine
Fig. 5Drive assembly, inspection
Drawing received

Day 0

Budget figure back the same day. STEP, DXF or PDF; a sketch is enough to start.

Full quote

Day 2

Price, lead time, and anything we would change. Held for thirty days.

First-off inspection

Day 12

The first part is checked against the drawing, and you see the report before the run is cut.

Production

Day 12 onward

Made to the delivery date we agreed, with inspection records travelling with the batch.

Send us the drawing.

A quote within two working days, with tolerances, lead time and the process we would use written on it.

Request a quote